D J Davies Fuels: from greenfield site to finished entrance
Working closely with the customer from the outset, we contributed to the design, coordinated with building manufacturer Shufflebottom and worked alongside Building Control throughout our involvement.
We worked alongside our colleagues at Dave Morris Steel Erecting, associated with our sister company Starkmorr Construction, who erected all the steelwork and installed the cladding on this project.
Site preparation and foundations
Excavation of the greenfield site to depths of up to 3 m, stone laid across the site, foundation excavation and holding-down bolts set. Ground levels raised by up to 1 m along the building elevations.
Concrete and internal works
Internal dividing walls between offices and workshop. A 200 mm concrete floor with two layers of A393 mesh, finished by power floating, plus external concrete aprons serving six roller shutter doors.
Drainage and service ducts
External foul and grey water drainage, with ducts brought into the building for power, water, weighbridge connections, data and EV charging points.
Entrance finishes
The final stage of our work: main entrance steps and ramps built using engineering bricks and porcelain paving.